MoreBeer.com - Absolutely Everything! for making your own beer at home.

Wednesday, July 9, 2008

Control Panel

I have started to put the control panel together. It will basically be a "Brutus Ten" control panel, though at the moment I am going to leave a couple of the switches out that where on the original plans. Here is the first look:

Top left is the main power switch. The temp controller on the left is for the mash tun and the one on the right is for the hot liquor tank. The two switches on the bottom are for the pumps. I have a couple of status lights I want to wire in to indicate when the burners are lit.

At this point just the switches and temp controllers are mounted in the box. The internal wiring will be next, along with reconfiguring some of the natural gas lines and hooking up the ASCO valves.